What it costs to build schools in Somalia
Tusmada
- Summary
- Where Xidig members may contribute
- Possible services, research, supplier or collaboration roles
- Who may find this useful
- What schools cost, and how many are needed
- Dependencies and implementation constraints
- Risks and unknowns
- Questions members should verify before acting
- What is confirmed, and what isn't
- Relevant next steps
- More about the source
- Notes on figures
- Related reports
- About this report
- Sources
What a new school costs in Somalia today, how many classrooms are needed, who is building them, and whether a US$298M school-building proposal adds up.
Not investment advice. Independent analysis of a government publication and public sources. The Government of Somalia has not endorsed it.
Summary
Somalia needs far more classrooms than it has, and building them costs more than many people assume. Engineers, cost estimators, education planners and teachers in the diaspora can help make school building cheaper, better planned and properly staffed.
What Xidig found:
- A new school is estimated at about US$280,000 on one current project. A World Bank-funded project estimated in late 2024 that a new eight-classroom school costs about US$280,000, more than double its design-stage estimate of about US$110,000. It cut its target from 180 new schools to 68.
- The need is very large. A 2024 programme document from the government and the Global Partnership for Education (GPE) says about 60,000 more classrooms are needed. In 2022 the Federal Member States had about 14,300 primary classrooms.
- Cheaper designs exist. Small donor and government projects have budgeted classrooms for a fraction of that cost, with simpler buildings.
- Buildings need teachers. The official teacher salary is US$330 a month, but most primary teachers were paid under US$100, according to the same 2024 document.
- Work is under way. A GPE-funded programme approved in 2024 plans 1,000 new classrooms over three years, and the education ministry launched the rehabilitation of a large Mogadishu school in May 2026.
The government has also listed a US$298.0M proposal for thousands of new schools, TVET centres, labs, teacher-training facilities and campuses. At current project costs that sum would pay for far fewer schools than it describes; details are under More about the source.
Where Xidig members may contribute
These are learning and collaboration opportunities, not confirmed jobs or contracts.
- Engineering and architecture: low-cost, durable school designs that suit the climate, with shade, ventilation, water and latrines.
- Cost estimating: independent unit costs for classrooms, labs and training centres, which Xidig could not find published.
- Education planning: using school-census data to decide where new classrooms are most needed.
- Teaching and school leadership: a new classroom only helps if a trained teacher is in it.
Possible services, research, supplier or collaboration roles
- An open cost benchmark for Somali school construction, updated each year from published project documents.
- Standard designs for two-, four- and eight-classroom schools, with bills of quantities.
- Construction-quality checks and community maintenance guides for schools already built.
- Solar lighting and water systems for rural schools. See Solar installer and technician skills in Somalia.
Who may find this useful
- Civil engineers, architects and quantity surveyors.
- Education planners and researchers.
- Teachers and school leaders.
- Education NGOs and community school committees.
What schools cost, and how many are needed
What one current project estimates.
- About US$280,000 per school: the mid-term review of the World Bank's Somalia Education for Human Capital Development project (November 2024) says the "unit cost of building a school (currently estimated at approximately $280,000) has more than doubled compared to design stage (about $110,000)".
- Why it rose: the same review lists cost inflation for materials, higher labour costs, eight classrooms per school instead of four, bigger classrooms, a concrete and block fence of nearly 400 metres "costing an extra $72,000 USD", and solar lighting.
- Fewer schools: "the number of schools to be constructed will be reduced from 180 to 68", with a budgeted "unit cost per newly constructed school" of US$220,588.
- Slow start: at the time of the review, "bidding has not yet begun for any of the 180 schools initially planned for construction". The project was due to close in June 2026. Xidig found no later count of schools completed.
What smaller projects have budgeted.
- Classrooms without cost figures: GPE reports that a programme run with the federal government and two NGOs between 2020 and 2023 built "400 new classrooms across 147 schools" and rehabilitated 394. Its report gives no cost.
- A small classroom block: a Japanese grant signed in 2017 provided US$82,991 for "six (6) permanent classrooms and eight (8) latrines", with furniture, extending an existing private primary school in Dayniile, Mogadishu.
- Small rural schools: in 2021 Somaliland's education ministry announced a government-funded programme of US$1.1M for rural schools of "2 to 4 classrooms" each.
- Temporary classrooms: a 2016 humanitarian proposal budgeted about US$2,500 for each temporary classroom and US$1,000 for its furniture.
These costs are from different years, places and building standards, so they are not directly comparable. What they show is that the answer to "what does a school cost?" depends mostly on the design chosen.
How many schools and classrooms exist, and how many are needed.
- Schools today: "According to the 2022 EMIS data, a total of 1,710 primary schools with around 14,296 classrooms exist across the country". These figures cover the Federal Member States. The same document says "on average, there are 48 students per classroom", and that 89% of schools are in urban areas.
- The need: "the government is required to construct an additional 60,000 classrooms (assuming 40 student per classrooms in a double shift arrangement)" (GPE programme document, 2024).
- Teachers per pupil: the education sector plan reports pupil–teacher ratios ranging "from a low of 32:1 to 60:1", and "1 qualified teacher present per 133 students in primary schools under public authority".
Who is building now.
- GPE: the system transformation grant, a 36-month programme approved in 2024, plans "1,000 new classrooms in locations with limited education infrastructure", using a standard school of eight classrooms, an administrative block and two latrine blocks. Its programme document gives no unit cost.
- The education ministry: in May 2026 it launched the rehabilitation of General Da'ud School in Mogadishu, which Dawan reports has 30 classrooms. No cost or funder was given.
- TVET centres: a German development bank (KfW) grant of €13M funds a wider programme that includes two TVET schools. Xidig found no cost for the buildings alone.
Teachers and running costs.
- Pay: "both primary and secondary teachers receive US$ 330 per month", but "About 59% of female and 49% of male primary teachers earn below US$ 100 per month" (GPE programme document, 2024).
- Teacher training: the World Bank project said it would stop its support to teacher training colleges from January 2025.
- Maintenance: the GPE programme relies on local communities "ensuring long term maintenance of the schools". Xidig found no maintenance budget.
- The whole sector's plan: the education sector strategic plan for 2022–2026 costs the whole sector at "US$387.9 million over the five-year period", about three-quarters of it recurrent costs.
What this means (Xidig's interpretation). Classrooms are badly needed, but a building programme costed without teachers, maintenance or a published unit cost is hard to judge. Current project costs suggest roughly 8,500 to 10,800 classrooms, not thousands of schools, for about US$300M. Cheaper designs could stretch the money further, if they are durable and staffed.
Dependencies and implementation constraints
- Teachers: new classrooms need trained, paid teachers. That is a recurring cost the building budget does not cover.
- Sites and land: school sites need clear ownership and community agreement.
- Security and access: contractors must be able to reach rural sites safely.
- Maintenance: someone must pay to keep roofs, latrines and water systems working.
- Coordination with the GPE and World Bank programmes already building classrooms.
Risks and unknowns
- Cost overruns: the World Bank project's unit cost more than doubled between design and 2024.
- Buildings without teachers, or without water and latrines.
- Low-cost designs that do not last, which cost more over time.
- Missing data: there is no published school census after 2022 in the sources Xidig found, and no figures for secondary or early-childhood schools.
Questions members should verify before acting
- How many schools would the US$298.0M build, and at what unit cost?
- How is the money split between schools, TVET centres, labs, teacher-training facilities and campuses?
- Who pays for the teachers and for maintenance once the buildings are finished?
- How many of the World Bank project's 68 schools have been built, and at what final cost?
What is confirmed, and what isn't
Confirmed
- The World Bank project's 2024 unit-cost estimate, its reasons, and the cut from 180 to 68 schools.
- The 2022 school-census figures and the estimated need for 60,000 more classrooms.
- Official teacher pay and the share of primary teachers paid under US$100 (2024 document).
- The GPE plan for 1,000 new classrooms.
Our interpretation
- At current project costs, US$298.0M would pay for far fewer schools than the proposal describes.
- Teachers and maintenance are the missing parts of the costing.
Not yet verified
- Any published unit cost for labs, TVET centres, teacher-training colleges or university campuses in Somalia.
- Progress on classroom construction in 2025–2026.
- Any ministry comment on the US$298.0M proposal.
Relevant next steps
- Ask the Ministry of Education, Culture and Higher Education for the breakdown and unit costs behind the US$298.0M figure.
- Engineers and quantity surveyors: compare the published project costs above and share a transparent cost model.
- Education planners: follow the ministry's school-census (EMIS) releases.
More about the source
The government's investment booklet, Bankable Projects 2026–2030 (MoPIED / SOMINVEST), lists this as a proposal. Its details are summarised here as printed.
New Education Infrastructure Development (ED-03, pp.87–88).
- What: "The scope includes thousands of new ECE, primary, and secondary schools, 12 TVET centres, 1065 labs, 7 teacher training facilities, and 3 new university campuses across all regions."
- Why: "Significant limitations in education infrastructure, especially in rural and remote areas." and "Student-to-teacher ratios far exceed the recommended 35:1, leading to classroom overcrowding."
- Aim: "The project aims to reduce the number of out-of-school children (OOSC) by removing physical barriers to access."
- Estimates as printed: US$298.0M; implementation 4.5 years; lifetime 10 years.
- Tick boxes: greenfield; PPP; pre-feasibility.
- Promoters: SOMINVEST and the Ministry of Education, Culture and Higher Education.
The sheet does not give a number of schools, a unit cost, a split between the building types, or any budget for teachers or maintenance. Its 12 TVET centres and 3 new campuses differ from the education sector plan, which lists 17 new public TVET centres and the rehabilitation of three existing Somali National University campuses.
- Primary source: MoPIED / SOMINVEST, Bankable Projects 2026–2030, posted 19 Nov 2025. Fact sheet at PDF pp.87–88.
- Status: pre-feasibility.
Notes on figures
These are Xidig's own calculations, not figures from any source.
- Per school: US$298.0M divided among 2,000 schools is about US$149,000 each; among 3,000 schools, about US$99,000. Both assume nothing is spent on the TVET centres, labs, teacher-training facilities or campuses.
- At the World Bank project's cost: at about US$280,000 per eight-classroom school, US$298.0M would pay for about 1,060 schools, or about 8,500 classrooms. At US$220,588 it would pay for about 1,350 schools.
- Against the need: 8,500 classrooms is about one-seventh of the 60,000 said to be needed.
- Teachers: 2,000 eight-classroom schools would have 16,000 classrooms. At one teacher per classroom and US$330 a month, salaries would cost about US$63M a year.
- Classrooms at the other unit cost: at US$220,588 per eight-classroom school, US$298.0M would pay for about 10,800 classrooms.
- Pupils per teacher: 746,483 primary pupils and 17,675 primary teachers in the Federal Member States in 2022 (GPE programme document) is about 42 pupils per teacher.
Related reports
- Digital learning, adult literacy and TVET in Somalia
- TVET and industry: where professionals can help
- Offline learning: radio, preloaded players and tablets
- Skills map: which professional skills the 37 proposals would need
- The National Transformation Plan 2025–2029 in brief
About this report
By Xidig members and collaborators.
Project codes. Codes such as EN-04 or AG-05 are Xidig's own shorthand for the booklet's fact sheets, by sector; the booklet itself does not number its projects.
How we researched it. We read the full 97-page booklet and checked every figure, page reference and quotation used here against it. We then compared the booklet's claims with the official, international, academic and news sources listed below, and we say where they differ. We did not interview anyone for this report.
Corrections. If you spot an error, please tell us using the correction link on this page.
Sources
Primary
- MoPIED / SOMINVEST, Bankable Projects 2026–2030, PDF pp.87–88: https://sominvest.gov.so/bankable-projects-in-somalia-2026-2030/
Supporting
- World Bank, Somalia Education for Human Capital Development Project (P172434), Mid-Term Review Aide Memoire (mission 11–15 Nov 2024): https://documents1.worldbank.org/curated/en/099122024155519202/pdf/P1724341a100cc03619f141af8c5c875d2d.pdf
- GPE / Federal Government of Somalia, System Transformation Grant programme document (dated 18 Jan 2024; published Mar 2024): https://www.globalpartnership.org/node/document/download?file=document/file/2024-03-program-document-system-transformation-grant-federal-government-somalia.pdf
- GPE, "Somalia: despite challenges, education paves the way for a promising future" (Jul 2024): https://globalpartnership.org/results/country-journeys/somalia-despite-challenges-education-paves-way-promising-future
- Ministry of Education, Culture and Higher Education, Education Sector Strategic Plan 2022–2026: https://planipolis.iiep.unesco.org/sites/default/files/ressources/somalia_essp-2022-2026.pdf
- Embassy of Japan in Kenya, grassroots grant signing for classrooms in Dayniile, Mogadishu (Feb 2017): https://www.ke.emb-japan.go.jp/files/000232696.pdf
- Somaliland Chronicle, "Ministry of Education and Science Unveils 1.1 Million US Dollar New School Construction Project" (25 Jan 2021): https://somalilandchronicle.com/2021/01/25/ministry-of-education-and-science-unveils-1-1-million-us-dollar-new-school-construction-project/
- Somalia Humanitarian Fund, education project proposal (2016): https://mptf.undp.org/sites/default/files/documents/25000/som-16-3485-r-ed-ingo-3929_projectproposal.pdf
- Dawan Africa, "Federal government launches rehabilitation of General Da'ud School in Mogadishu" (6 May 2026): https://www.dawan.africa/news/federal-government-launches-rehabilitation-of-general-daud-school-in-mogadishu
- "Delivering transformational vocational education in Somalia" (design consultant's article on the KfW-funded TVET schools, 19 Nov 2025): https://www.fbwgroup.com/2025/11/19/delivering-transformational-vocational-education-in-somalia/
Source notes
- School-census figures (2022) cover the Federal Member States only.
- Construction costs come from projects of different years, sizes and standards; they are illustrations, not a benchmark.