Roads and floods in Somalia: damage, design and maintenance
Tusmada
- Summary
- Where Xidig members may contribute
- Possible services, research, supplier or collaboration roles
- Who may find this useful
- What floods do to Somalia's roads, and how to build for them
- Dependencies and implementation constraints
- Risks and unknowns
- Questions members should verify before acting
- What is confirmed, and what isn't
- Relevant next steps
- More about the source
- Notes on figures
- Related reports
- About this report
- Sources
Floods cut Somalia's roads and bridges almost every rainy season. What recent floods destroyed, how resilient roads are designed, and why maintenance is the weak link.
Not investment advice. Independent analysis of a government publication and public sources. The Government of Somalia has not endorsed it.
Summary
Floods cut Somalia's roads and wash away bridges almost every rainy season, isolating towns and raising the cost of moving food and goods. Designing roads that survive floods, and keeping them maintained, is specialist work where diaspora engineers can add real value.
What Xidig found:
- The damage is large and repeated. The 2019 floods damaged an estimated 321 km of road and 23 bridges. The 2023 floods caused about US$29.7 million of transport damage in the districts assessed, and most of the recovery need was for bridges. Roads were cut again in 2024 and 2025.
- Resilient design is known and in use. Current donor-funded road sections include side drains, culverts, raised embankments in flood-prone stretches, gabions and new bridges.
- Water does most of the damage. A 2022 study for Somaliland cites a general estimate that water causes 35–80% of road damage, and recommends roads designed to manage water.
- Maintenance is the weak link. A road maintenance framework is planned for 2026 to 2029, and a roads authority is planned but not yet set up.
- Climate plans include roads. Somalia's 2025 climate plan sets aside about US$1.4 billion to climate-proof roads, bridges, drainage and other infrastructure.
The government has also listed a proposal to rehabilitate 3,825 km of existing roads, citing resilience against flooding and overloading. It is at an early stage; details are under More about the source.
Where Xidig members may contribute
These are learning and skills opportunities, not confirmed jobs or contracts.
- Hydrology and drainage design: sizing culverts, drifts and bridges for Somali rivers and flash floods.
- Road maintenance systems: inventories, condition surveys and budgeting tools.
- Local knowledge: recording where roads flood, when, and for how long.
- Labour-based methods: building and maintaining rural roads with local workers.
Possible services, research, supplier or collaboration roles
- A flood-point map of main routes, built from members' travel and public reports.
- Training for local engineers and contractors in drainage design and maintenance.
- Low-cost crossings such as drifts and causeways for rural roads.
- Road-and-water designs that harvest runoff for farms and livestock.
Who may find this useful
- Civil, highway and water engineers.
- Road contractors and consultants.
- Transport operators and traders.
- Humanitarian logistics staff and local authorities.
What floods do to Somalia's roads, and how to build for them
Recent flood damage.
| Event | Roads and bridges | Cost | Source |
|---|---|---|---|
| 2019 floods (October–November) | About 321 km of road and 23 bridges damaged | Transport damage and losses US$94.8M; recovery needs about US$115M | World Bank and government assessment (2020) |
| 2023 Deyr / El Niño floods | Roads and bridges "damaged, washed away and/or rendered impassable" | Transport damage about US$29.7M; recovery needs US$37.4M, 55% for bridges | Rapid assessment of 16 districts (2024) |
| 2024 Gu floods | Main roads in parts of Jubaland "flooded and are impassable" | Not assessed | OCHA (May 2024) |
| 2025 Gu floods | Afmadow–Kismayo roads impassable; "The Balcad-Jowhar route was damaged" | Not assessed | OCHA (April–May 2025) |
- 2019: the assessment says the floods left "nearly 70 percent" of Beledweyne under water. Total damage and losses across all sectors were more than US$260 million, and transport was the largest share.
- 2023: OCHA reported that "Bridges have collapsed in Baardheere and Buurdhuubo", and that aid agencies delivered 43 boats to reach areas where roads were impassable. The 2023 assessment covered only 16 districts, so it understates national damage.
- A recurring pattern: an OCHA update from May 2020 describes trucks "stuck for days" on the supply route from Gaalkacyo to Hobyo and other towns, and roads around Kismayo made impassable.
How flood-resilient roads are designed.
- In current projects: the African Development Bank's 2025 appraisal for two road sections describes "longitudinal side drains, cross-drainage culverts, and erosion control measures, informed by hydrological assessments", "elevated embankments in low-lying and flood-prone sections", gabions for slope stabilisation, bitumen modified to resist heat, and new bridges. It rates the project as highly vulnerable to climate risks.
- Roads that manage water: a 2022 scoping study for Somaliland, by an NGO with a research partner, says "Water generally causes 35-80% of road damage" and recommends drifts, culverts, check dams and roadside water harvesting, with designs matched to local soils, slopes and rainfall.
- Low-cost crossings: in 2016 the ILO built a drift to protect a rehabilitated gravel road in Baidoa from flooding.
- Local labour: an ILO programme in Baidoa funded by KfW (US$11.5M, 2019–2025) planned to rehabilitate about 20 km of roads with local labour and was expected to generate "more than 300,000 workdays".
- Standards: a GIZ project funded by Germany and the EU (2014–2024) says national road standards "have been developed and established in conformity with international standards". The project worked in several regions, including repairs to 52 culverts on the Hargeisa–Kalabaydh road; Xidig did not find the standards document online.
Maintenance, overloading and funding.
- The gap: the ministry of public works' 2025 report says roads "are not resilient enough to withstand climate challenges", and plans to "Manage flooding during rainy season by including robust drainage systems in renovation designs".
- A plan: the African Development Bank describes "a road maintenance framework set for implementation between 2026 and 2029", plans "to establish a Roads Authority", and a roads development policy.
- Overloading: for the Zeila–Asha Addo section, the African Development Bank says the Somaliland Roads Development Agency "will be enforcing axle load control". It says road maintenance there is funded mainly under a Special Road Levy Act (fuel levies, transport taxes and export fees), and that this is not enough to meet maintenance needs. Xidig found no federal axle-load regulation or road fund.
- World Bank: the Somalia Infrastructure Development for Access and Jobs Program, Phase 1 (P513127), a US$160M grant approved in May 2026, has a component on "Sustainable Operations and Maintenance" (US$8.5 million) that supports maintenance plans for the roads, drainage and airports it finances. Its road works are a 63 km section from Hargeisa to the Ethiopian border at Ina Guha, according to its April 2026 appraisal document. Its February 2026 concept note, under an earlier name, said "operations and maintenance are underfunded".
Climate plans.
- Somalia's 2025 climate pledge (NDC 3.0): "A total of $1,400 billion (23%) will be directed toward improving connectivity, and climate proofing infrastructure in urban and rural areas", including roads, bridges and drainage. The figure is printed this way; as 23% of the plan's adaptation total of about US$6.3 billion, it means about US$1.4 billion.
- National Adaptation Plan: Somalia submitted one in September 2025. Xidig could not open the document to check its transport measures.
What this means (Xidig's interpretation). Somalia's road problem is not only too few paved roads but roads and bridges that fail in floods and are not maintained. The design methods are known and already in use on donor-funded sections. The harder part is a steady maintenance budget, control of overloaded trucks, and hydrological data for bridges.
Dependencies and implementation constraints
- Hydrological data for rivers and flash-flood channels, which is scarce.
- Maintenance funding that lasts beyond donor projects.
- An institution to own the network, such as the planned roads authority.
- Security and access for survey and construction teams.
- Coordination between the federal ministry, regional road agencies and donors.
Risks and unknowns
- Bridges are the most expensive part of flood recovery and the most likely to fail.
- Rebuilding to the old design, which can fail again in the next flood.
- Overloaded trucks that damage new surfaces quickly.
- Unmeasured damage: there is no national assessment for the 2024 and 2025 floods in the sources Xidig found.
Questions members should verify before acting
- Which road sections flood most often, and how long are they closed?
- Will the maintenance framework have its own budget, and from what revenue?
- What design standard will rehabilitation works use?
- Which roads will later phases of the World Bank programme cover, and when will work start?
What is confirmed, and what isn't
Confirmed
- Flood damage to roads and bridges in 2019 and 2023, and road cut-offs in 2024 and 2025.
- The resilience features in the African Development Bank's road sections.
- The planned maintenance framework and roads authority.
- The climate-plan allocation for infrastructure, as printed.
Our interpretation
- Maintenance and drainage matter as much as new paving.
Not yet verified
- Damage figures for the 2024–2026 floods.
- The content of the National Adaptation Plan for roads.
- The roads in later phases of the World Bank programme.
Relevant next steps
- Ask the Ministry of Public Works, Reconstruction and Housing for the maintenance framework and design standards.
- Engineers: follow tenders from the African Development Bank and World Bank road programmes.
- Members who travel main routes: record flood points and closure times.
More about the source
The government's investment booklet, Bankable Projects 2026–2030 (MoPIED / SOMINVEST), lists this as a proposal. Its details are summarised here as printed.
Rehabilitation of Existing Roads (LI-01, pp.51–52).
- What: "Rehabilitation of 3,825 km of existing key tarmac roads across Somalia. The project will improve resilience against climate challenges, reduce transport costs, and cut commodity transport time from 2.6 days to as little as 5–12 hours."
- Why: "Provide resilient infrastructure against flooding and overloading." and "Improve average road speed from 30 km/h to 60 km/h."
- Existing infrastructure named: "Current national road network (~13% paved)."
- Estimates as printed: "$1,071 B"; implementation 5 years; project lifetime 2025–2029. The notation needs confirmation; it could mean US$1,071 million.
- Tick boxes: brownfield, greenfield and expansion are all ticked; PPP; pre-feasibility.
- Promoters: SOMINVEST and the Ministry of Public Works, Reconstruction and Housing.
The sheet does not name the roads, the design standard or how maintenance would be paid for. A second proposal for 2,075 km of new roads is covered in Somalia's roads and trade corridors.
- Primary source: MoPIED / SOMINVEST, Bankable Projects 2026–2030, posted 19 Nov 2025. Fact sheet at PDF pp.51–52.
- Status: pre-feasibility.
Notes on figures
- 2019 and 2023 are not directly comparable: the 2019 assessment covered the whole flood; the 2023 rapid assessment covered 16 districts.
- Transport's share in 2019: US$94.8M of US$262M in total damage and losses is about 36% (Xidig's calculation).
- The climate-plan figure is printed as "$1,400 billion"; the context shows it means about US$1.4 billion.
Related reports
- Somalia's roads and trade corridors
- Hobyo's port plans and the road inland
- Upgrading four regional airports: Kismayo, Baidoa, Beledweyne and Dhusamareb
- The National Transformation Plan 2025–2029 in brief
- Skills map: which professional skills the 37 proposals would need
About this report
By Xidig members and collaborators.
Project codes. Codes such as EN-04 or AG-05 are Xidig's own shorthand for the booklet's fact sheets, by sector; the booklet itself does not number its projects.
How we researched it. We read the full 97-page booklet and checked every figure, page reference and quotation used here against it. We then compared the booklet's claims with the official, international, academic and news sources listed below, and we say where they differ. We did not interview anyone for this report.
Corrections. If you spot an error, please tell us using the correction link on this page.
Sources
Primary
- MoPIED / SOMINVEST, Bankable Projects 2026–2030, PDF pp.51–52: https://sominvest.gov.so/bankable-projects-in-somalia-2026-2030/
Supporting
- World Bank / Federal Government of Somalia, Somalia – 2019 Floods Impact and Needs Assessment (Feb 2020): https://documents1.worldbank.org/curated/en/764681585029507635/pdf/Somalia-2019-Floods-Impact-and-Needs-Assessment.pdf
- UN OCHA, "Floods leave thousands of people vulnerable and in need" (19 Nov 2019): https://reliefweb.int/report/somalia/floods-leave-thousands-people-vulnerable-and-need
- Federal Government of Somalia with UNDP, World Bank and EU, Somalia Deyr Floods Rapid Post-Disaster Needs Assessment, executive summary (Jun 2024): https://www.undp.org/sites/g/files/zskgke326/files/2024-06/somalia_deyrfloods_r-pdna_executive_summary_07062024.pdf
- UN OCHA, Somalia 2023 Deyr season floods, situation report no. 4 (10 Dec 2023): https://www.unocha.org/publications/report/somalia/somalia-2023-deyr-season-floods-situation-report-no-4-10-december-2023
- UN OCHA, Somalia 2024 Gu season heavy rains and floods, flash update no. 3 (6 May 2024): https://reliefweb.int/report/somalia/somalia-2024-gu-season-heavy-rains-and-floods-flash-update-no-3-6-may-2024-enso
- UN OCHA, Somalia 2025 Gu seasonal flash floods, flash update no. 1 (22 Apr 2025): https://reliefweb.int/report/somalia/somalia-2025-gu-april-june-seasonal-flash-floods-flash-update-no-1-22-april-2025
- UN OCHA, Somalia 2025 Gu seasonal floods, flash update no. 3 (13 May 2025): https://reliefweb.int/report/somalia/somalia-2025-gu-april-june-seasonal-floods-flash-update-no3-13-may-2025
- UN OCHA, flash flooding update no. 3 (5 May 2020): https://somalia.un.org/en/download/10418/44685
- African Development Bank, Somalia Road Infrastructure Programme, additional financing, project appraisal report (Nov 2025): https://www.afdb.org/sites/default/files/documents/projects-and-operations/multinational_somalia_somalia_road_infrastructure_programme_additional_financing_somalia_djibouti_ethiopia.pdf
- Welthungerhilfe and MetaMeta Research, Green Roads for Water – Somaliland: Scoping Study (Feb 2022): https://roadsforwater.org/wp-content/uploads/2022/02/08022022_Final-Report_GR4W_Somaliland.pdf
- ILO, "Employment creation through rehabilitation of Xannaano road" (2016): https://www.ilo.org/resource/news/employment-creation-through-rehabilitation-xannaano-road
- ILO, Development Cooperation Dashboard, project SOM/19/01/DEU: https://webapps.ilo.org/DevelopmentCooperationDashboard/p/project/107353
- ILO, "From displacement to decent work: women rebuild roads and their futures in Somalia" (15 Jan 2026): https://www.ilo.org/resource/article/displacement-decent-work-women-rebuild-roads-and-their-futures-somalia
- GIZ, Support to road authorities in Somalia (Sustainable Road Maintenance Project): https://www.giz.de/en/projects/support-road-authorities-somalia
- Ministry of Public Works, Reconstruction and Housing, NTP quarterly report (Q1 2025): https://mpwr.gov.so/wp-content/uploads/2025/06/NTP.pdf
- World Bank, Project Information Document P513127 (7 Feb 2026): https://documents1.worldbank.org/curated/en/099020726020018361/pdf/P513127-1143db4f-6238-4203-90cb-1a0736667907.pdf
- World Bank, Project Information Document, appraisal stage, P513127 (1 Apr 2026): https://documents1.worldbank.org/curated/en/099040126085561541/pdf/P513127-1a5af24e-c8fb-43fd-8e47-aa6246e9defa.pdf
- Federal Government of Somalia, Nationally Determined Contribution 3.0 (2025): https://unfccc.int/sites/default/files/2025-06/Somalia%20NDC%203.0_Submitted_to_UNFCCC_Final.pdf
- NAP Central, submitted National Adaptation Plans (Somalia, posted 25 Sep 2025): https://napcentral.org/submitted-naps
Source notes
- Flood reports describe access at the time; roads may have reopened since.